Services

List of Jobs

  • K-1 Staking
    • Boundary Staking of RECORD boundary corners ONLY
    • Sketch NOT included – see K2
    • POLs (Points-on-line) are extra points on a boundary line are NOT included and must be requested BEFORE a quote is
      provided
    • Easements are NOT included in a stakeout UNLESS requested in advance prior to providing a quote
    • Current Preliminary Title Report and/or Deed (with land description) are required before initiation of new job
  • K-2 Boundary Survey
    • Boundary Staking of RECORD boundary corners
    • Survey along boundary lines ONLY
    • Structures (houses, garages, sheds, etc.) NOT included (unless near property boundary) – must be requested BEFORE a
      quote is provided
    • Current Preliminary Title Report and/or Deed (with land description) are required before initiation of new job
    • Sketch is provided showing encroachments along the property lines
    • Certification letter provided stating areas of concern near property boundary (i.e. fences, walls, roof overhands, etc.)
    • **Points in Streams, gulches or dangerous conditions may not be found or set**
  • Topographic Survey – Whole Property or Partial
    • MUST provide a sketch of the area requested for both whole and partial (preferably a google earth image showing existing
      structures and features in order to provide an accurate quote)
    • Pictures of the current property conditions are appreciated
    • Current Preliminary Title Report and/or Deed (with land description) are required before initiation of new job
    • Does NOT include a boundary staking or the areas of concern report for encroachments(must be an additional request
      prior to providing a quote)
    • Does NOT show EVERY detail, but will include the significant ones (i.e. LARGE trees, fences, walls, structures, concrete
      work, etc.)
  • Shoreline Survey
    • Current Preliminary Title Report and/or Deed (with land description)are required before initiation of new job
    • Any encroachments to the Shoreline must have an existing easement or an easement must be acquired before submittal to
      the State
    • Requires an owner consent letter, additional fees to DLNR for application and travel reimbursement
    • Preparation of a plat to be submitted to state (usually required for any renovations, remodels, construction, etc. on a
      property with a shoreline)
  • Creation of Easement (waterline, sewer, access, etc.)
    • Must provide a sketch of the area
    • Must provide any evidence maps, sketches, or written agreements (recorded or not recorded that will help us determine the
      boundary(s) and easement(s) that are together with or reserving there from subject parcel
  • POLs (Points-on-Line)
    • Must provide a sketch “red-lining” or “highlighting” the specific boundary lines where POLs will be placed
  • Metes and Bounds (aka Legal Description or Land Description)
  • Construction Staking and Layouts
  • Boundary Disputes
  • Accident Scenes
  • AS-Built Survey
  • ALTA/ACSM Land Title Surveys
  • Aerial Photogrammetry
  • Land Descriptions w/ PLAT
  • Easement Descriptions w/ PLAT
  • Condominiums
  • Subdivisions- Preliminary, Final & Final Staking of Newly Created Lots
  • GPS Surveys
  • Expert Witness
  • Horizontal &Vertical Control Surveys
  • Complex Boundary Resolution
  • Consolidations & Resubdivision
  • Map Checking
  • State of Hawaii- Land Court, File Plans, C.S.
  • F. Maps, Shoreline Mapping, & Easements
  • County of Maui- Any and all surveying required by county agencies
  • Wind & Solar Farm Layouts
  • Street Monument Control  Stakeout w/ Straddlers & Final AS-Builts
  • Consultation- Question & Answers
  • Quality Assurance & Quantity Surveys
  • Right of Way Surveys and Interpretation
  • Settlement & Displacement Surveys
  • Monitoring Surveys
  • View Plane Easement
  • Wetlands Topographic Mapping
  • FEMA Flood Certifications
  • Construction Form Location & Height Certifications
  • Proposed Building or Any Structure  Layout For Show & Tell
  • Precision Layout for High Tech Implementation